Via Bonita Construction Progress

Foundation and concrete work has been completed and framing is well underway at the Via Bonita remodel. Splicing the new with the existing is always a challenge but the contractor is doing a great job. Kudos to JBC for a job well done thus far! A step down was designed from the existing raised foundation into the new slab on grade greatroom. The step down gives more volume to the room and a better connection to the exterior. Take a look at the "hot off the press" project images under RESIDENTIAL : VIA BONITA REMODEL to see the design concept for the remodel. Check back in soon for further construction updates.